ENVIRONMENTAL REPORTS – 2019, 2020

TOXIC EXPOSURE – ENVIRONMENTAL REPORTS

 

AEG

SPECIES OF MOLD REPORTED SUBSEQUENT TO AEG ENVIRONMENTAL TESTING ORDERED AND SECURED DIRECTLY BY THE STATE FARM ARIZONA DESK ADJUSTER IN MARCH 2019, after SERVPRO had offered, in writing, to obtain a report to authorize buildback (knowing full well that the roof had not yet been replaced and no apparent remediation took place.)  ServPro had orginally ordered and secured “Asbestos Testing” directly with AEG with State Farm adjuster approval.  Plaintiff was not involved in the Adjuster/Vendor negotiations or instructions until problems became evident and the damages had escalated.

AEG

MOLD 2019 AND 2020

STATE FARM PREFERRED VENDOR, AMERICAN ENVIRONMENTAL GROUP, WAS DISPATCHED TO THE PROPERTY BY THE STATE FARM ADJUSTER IN MARCH 2019.  ONLY 3 ROOMS WERE TESTED AND THE PROPERTY WAS DEEMED TO BE READY FOR BUILD BACK.  THIS WAS NOT DONE IN ACCORDANCE WITH ACCEPTED PROTOCOLS, AND WITH THE KNOWLEDGE THAT THE ENTIRE HOME HAD WEEKS OF UNMITIGATED WATER DAMAGE AND DRY WALL AND INSULATION SATURATION.  IT IS A 6 ROOM HOUSE PLUS GARAGE (where unremediated household goods were stored in used remediation company boxes from mid-February 2019 through the end of June 2019.

AEG

AEG 3-18 – Acceptable Baseline Mold Report – Ayres Property 

AEG 3-17 AND 18-19 – Acceptable Baseline Mold Report – Ayres Property

AMERICAN ENVIRONMENTAL GROUP WAS CONTACTED DIRECTLY BY THE PROPERTY OWNER IN AUGUST 2019, WITH CONSENT, PERMISSION AND AUTHORIZATION FROM STATE FARM,  FOR A FULL AND COMPLETE HOUSE AND GARAGE AIR QUALITY INSPECTION, AT INSURED’S EXPENSE.

 

Could #TheTARP installed by #ServPro pictured here keep even sprinkles out? February 2019 – #Stormageddon, according to MSM — rain, wind and snow…. #WhoYaGonnaTag?

 

 

AEG 8-2019 Baseline Mold Spore Report – Ayres Property

 

THE RESULTS SUGGEST GROSS CRIMINAL NEGLIGENCE AND POSSIBLE INSURANCE FRAUD AS THE ENTIRE HOUSE AND GARAGE WERE DEEMED TO BE “unacceptable*” WITHOUT REFERENCE TO KNOWN IDENTIFIED WATER DAMAGED WALLS THAT HAD NOT BEEN REMEDIATED.  NO PROTOCOL WAS RECOMMENDED UNTIL PROPERTY OWNER DISCUSSED THE DANGERS OF UNMITIGATED WATER DAMAGE.  THE REPORT WAS REVISED TO SUGGEST ‘ENVIRONMENTAL HYGIENIST HEPA LEVEL CLEANING.  THIS ACTION SEEMS TO SERVE IN A COVER UP CAPACITY FOR NEGLIGENCE OF THEIR FIRST MARCH 2019 REPORT, AND FURTHER COLLUSION IN COVERUP OF THE OBVIOUS DAMAGE IN THE AUGUST 2019 REPORT.

ANOTHER VENDOR WITH PREFERRED VENDOR PROGRAM AFFILIATION WITH STATE FARM INSPECTED THE HOME BASED ON THE PROTOCOL AND SUBMITTED TO STATE FARM AN ESTIMATE OF APPROXIMATELY $10,000 FOR ENVIRONMENTAL CLEANING; ALSO IGNORING THE OBVIOUS CAUSE OF HIGH TOXIC READINGS BEING THE KNOWN, IDENTIFIED UNDEMOLISHED AND UNMITIGATED WATER DAMAGE OF WALLS IN THE CIRCLES AREAS OF THE DIAGRAM.

joey c – 10 22 2019 Gmail – 55-7536-D61  

PURO CLEAN SERVICES – estimate on AEG August 2019 protocol

PURO CLEAN Linda Ayres

NOVEMBER 2019

GEO EARTH

INITIAL MOLD PROTOCOL S-520 LINDA AYRES11-12-2019 REPORT

INITIAL MOLD RESULTS LINDA AYRES NOV-12-2019–711900758_003[12475]

SUN MESA MOISTURE DAMAGE REPORT – DEMOLITION REQUIRES AS NOTED IN NOV 2019

MARCH 13, 2020

GEO EARTH

FINAL 1 – MOLD REPORT 3 2020

FINAL-1-2 MOLD IR REPORT LINDA58137-PT-0320-2-2M—3-13-2020

FINAL-2-2 MLD RESULTS 3-16-2020–712000544_001[15501]

RAPID DRY – REMEDIATION FEBRUARY MARCH APRIL 2020

RAPID DRY

Ayres remediation drawing (1)

rapdi dry – exactomate march 2020 AyresSupplemental 03242019

SEE ADDITIONAL REPORTS BELOW THE FEB/MARCH 2020 IMAGES

IMAGES – FEBRUARY MARCH APRIL 2020

MASTER BEDROOM CLOSET 

MASTER BEDROOM- PHASE 1  – demolition was completed with further findings

MASTER BEDROOM DEMOLITION WAS COMPLETED IN SECOND PHASE  – SEE PROTOCOL/FINAL REPORT

[ADD FINAL PHOTOS — SEE VIDEO CHANNEL:   InsurerWars.com  ]

LIVING ROOM

BATHROOM

Full Demolition and remediation done in phase 2; see Protocol and final report.

SMALL BEDROOM

7/15/2019 MOLD TEST COMPANY

MOLD TEST LABS Linda Ayers Lab #1 july 2019pdf

9/23/2019  DESERT DETECTION –

SEPTEMBER 23, 2019  – MY MOLD DETECTIVE

MOLD REPORT SEPTEMBER 2019 Report

5/18/2020  DESERT DETECTION –  MAY 18, 2020 –

MY MOLD DETECTIVE

app_aircarecompanies_com_reports_view_32860_321456987_print_yes Report_Form_Pro_2_Inspection_Report

6/23/2020 MOLD INSPECTION SCIENCES

Mold Inspection Report_Linda Ayres_R (1)

Lab Report_Linda Ayres_58137 Sun Mesa Dr_Air

ERMI Lab Report_Linda Ayres_58137 Sun Mesa DrHERTSMI-2 Score Sheet_Linda Ayres

3 responses to “ENVIRONMENTAL REPORTS – 2019, 2020”

  1. Reblogged this on Got Contractor Complaints and commented:

    #BlackMoldMatters … #WhoYaGonnaCall?

    Like

  2. #TeachingMoments — learn more at GotContractorComplaints.com and InsurerWars.com

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: