TOXIC EXPOSURE – ENVIRONMENTAL REPORTS – START WITH THE SCIENCE

AMERICAN ENVIRONMENTAL GROUP, MOLD TEST COMPANY, DESERT DETECTION, MY MOLD DETECTIVE, MOLD INSPECTION SCIENCES

Could #TheTARP pictured here even keep sprinkles out? February 2019 – #Stormageddon, according to MSM — rain, wind and snow…. #WhoYaGonnaTag?

See ARCHIVES for more 

65% OF ROOF BLEW OFF 2/2/2019  – REPLACED MID-MARCH – AFTER WEEKS OF UNMITIGATED WATER POURING IN FROM MULTIPLE STORMS – RAIN AND SNOW, WITH ONLY PAINTERS’ -LIKE PLASTIC HELD IN PLACE BY BAGS OF DIRT, SHUFFLED PERIODICALLY AFTER EACH STORM. : (

WATER CONTINUED TO POUR INTO THE HOUSE THRU LIGHT FIXTURES, DOOR JAMS AND ANY WAY IT COULD GET IN.

SECOND DEMO, 90% OF HOUSE, 2/2020 — AFTER EXTREME TOXIC EXPOSURE

WHO YA GONNA CALL WHEN STATE FARM SAYS THEY HANDLED THE CLAIM CORRECTLY…. BY DISPATCHING THEIR PREFERRED VENDORS, WHO REPORTED DIRECTLY TO AND NEGOTIATED DIRECTLY WITH THE ARIZONA CLAIMS ADJUSTER… WHO APPARENTLY APPROVED A 40 DAY DELAY IN ROOF REPLACEMENT, DESPITE FRANTIC ALERTS FROM POLICYHOLDER, BEGGING FOR AUTHORIZATION TO REPLACE THE ASSIGNED PREFERRED VENDORS FOR OVER 30 DAYS….

RAIN AND SNOW POURED INTO THE INTERIOR FOR WEEKS OF STORMS…. WITH ONLY A PAINTER’S PLASTIC QUALITY “TARP” ALLEGEDLY PLACED TO STOP THE WATER INTRUSION.

 

[Tech challenge; being corrected asap; current links below download to PDF….  ideally, they will simply open for viewing]

AEG

SPECIES OF MOLD REPORTED SUBSEQUENT TO AEG ENVIRONMENTAL TESTING ORDERED AND SECURED DIRECTLY BY THE STATE FARM ARIZONA DESK ADJUSTER IN MARCH 2019, after SERVPRO had offered, in writing, to obtain a report to authorize buildback (knowing full well that the roof had not yet been replaced and no apparent remediation took place.)  ServPro had originally ordered and secured “Asbestos Testing” directly with AEG with State Farm adjuster approval.  Plaintiff was not involved in the Adjuster/Vendor negotiations or instructions until problems became evident and the damages had escalated.

AEG

MOLD 2019 AND 2020

STATE FARM PREFERRED VENDOR, AMERICAN ENVIRONMENTAL GROUP, WAS DISPATCHED TO THE PROPERTY BY THE STATE FARM ADJUSTER IN MARCH 2019.  ONLY 3 ROOMS WERE TESTED AND THE PROPERTY WAS DEEMED TO BE READY FOR BUILD BACK.  THIS WAS NOT DONE IN ACCORDANCE WITH ACCEPTED PROTOCOLS, AND WITH THE KNOWLEDGE THAT THE ENTIRE HOME HAD WEEKS OF UNMITIGATED WATER DAMAGE AND DRY WALL AND INSULATION SATURATION.  IT IS A 6 ROOM HOUSE PLUS GARAGE (where unremediated household goods were stored in used remediation company boxes from mid-February 2019 through the end of June 2019.

AEG

AEG 3-18 – Acceptable Baseline Mold Report – Ayres Property AEG 3-17 AND 18-19 – Acceptable Baseline Mold Report – Ayres Property

AMERICAN ENVIRONMENTAL GROUP WAS CONTACTED DIRECTLY BY THE PROPERTY OWNER IN AUGUST 2019, WITH CONSENT, PERMISSION AND AUTHORIZATION FROM STATE FARM,  FOR A FULL AND COMPLETE HOUSE AND GARAGE AIR QUALITY INSPECTION, AT INSURED’S EXPENSE.

AEG

aeg-8-2019 -baseline-mold-spore-report-ayres-property

THE RESULTS SUGGEST GROSS CRIMINAL NEGLIGENCE AND POSSIBLE INSURANCE FRAUD AS THE ENTIRE HOUSE AND GARAGE WERE DEEMED TO BE “unacceptable*” WITHOUT REFERENCE TO KNOWN IDENTIFIED WATER DAMAGED WALLS THAT HAD NOT BEEN REMEDIATED.  NO PROTOCOL WAS RECOMMENDED UNTIL PROPERTY OWNER DISCUSSED THE DANGERS OF UNMITIGATED WATER DAMAGE.  THE REPORT WAS REVISED TO SUGGEST ‘ENVIRONMENTAL HYGIENIST HEPA LEVEL CLEANING.  THIS ACTION SEEMS TO SERVE IN A COVER UP CAPACITY FOR NEGLIGENCE OF THEIR FIRST MARCH 2019 REPORT, AND FURTHER COLLUSION IN COVERUP OF THE OBVIOUS DAMAGE IN THE AUGUST 2019 REPORT.

ANOTHER VENDOR WITH PREFERRED VENDOR PROGRAM AFFILIATION WITH STATE FARM INSPECTED THE HOME BASED ON THE PROTOCOL AND SUBMITTED TO STATE FARM AN ESTIMATE OF APPROXIMATELY $10,000 FOR ENVIRONMENTAL CLEANING; ALSO IGNORING THE OBVIOUS CAUSE OF HIGH TOXIC READINGS BEING THE KNOWN, IDENTIFIED UNDEMOLISHED AND UNMITIGATED WATER DAMAGE OF WALLS IN THE CIRCLES AREAS OF THE DIAGRAM.

joey c – 10 22 2019 Gmail – 55-7536-D61  

PURO CLEAN SERVICES – estimate on AEG August 2019 protocol

PURO CLEAN Linda Ayres

NOVEMBER 2019

Ayres remediation drawing (1)

 

SEE ADDITIONAL REPORTS BELOW THE FEB/MARCH 2020 IMAGES

IMAGES – FEBRUARY MARCH APRIL 2020

MASTER BEDROOM CLOSET 

MASTER BEDROOM- PHASE 1  – demolition was completed with further findings

MASTER BEDROOM DEMOLITION WAS COMPLETED IN SECOND PHASE  – SEE PROTOCOL/FINAL REPORT

[ADD FINAL PHOTOS — SEE VIDEO CHANNEL:   InsurerWars.com  ]

LIVING ROOM

BATHROOM

Full Demolition and remediation done in phase 2; see Protocol and final report.

SMALL BEDROOM

7/15/2019 MOLD TEST COMPANY

MOLD TEST LABS Linda Ayers Lab #1 july 2019pdf

9/23/2019  DESERT DETECTION –

SEPTEMBER 23, 2019  – MY MOLD DETECTIVE

MOLD REPORT SEPTEMBER 2019 Report

5/18/2020  DESERT DETECTION –  MAY 18, 2020 –

MY MOLD DETECTIVE

app_aircarecompanies_com_reports_view_32860_321456987_print_yes Report_Form_Pro_2_Inspection_Report

6/23/2020 MOLD INSPECTION SCIENCES

Mold Inspection Report_Linda Ayres_R (1)

Lab Report_Linda Ayres_58137 Sun Mesa Dr_Air

ERMI Lab Report_Linda Ayres_58137 Sun Mesa DrHERTSMI-2 Score Sheet_Linda Ayres

 

#MyHome through #2020Lockdown ….   #ThanksStateFarm and Gangs…

 

%d bloggers like this: